ECONOMIC EFFICIENCY OF FAST WELL DRILLING IN DONBASS
Keywords:
Abstract
The main purpose of this paper is to study the optimal conditions for rational degassing during gas-hazardous mines operation and cost-effectiveness to ensure safe operation, to increase coal production and to use the produced gas commercially. The work methodology is complex and combines mining-technological and economic components. The first step was to analyze the results of the project degassing, which was held directly in the field CG "Pokrovske", and define the main parameters affecting the efficiency of degassing. The parameters of drilling conducted on CG "Pokrovske" in 2012 were generalized. The next step was to establish a correlation between the parameters of drilling speed and lava promotion. The data on real drilling performance achieved in the implementation of degassing project showed that the average drilling speed was now about 100 m per day against the previous years' average of 500 m per month. The formulas for determining annuity from the drilling organization operations are given. The final stage of the research was to determine the optimum drilling performance for degassing at an economically favorable, rational expediency and efficiency level. The obtained results revealed that the main parameters affecting the efficiency of degassing are drilling speed, optimization of degasification wells construction, as well as calculation of the effective well spacing and timing of their preparation for the lavas approach. It has been found out that the main factors to achieve efficiency of operation include cutting down on wages of the workers engaged in servicing rigs, due to drilling speeds, and decreasing investments into the construction of wells. Emphasis is laid on the need for integrated development of the existing fields, which combines degassing with coal mining. Scientific novelty of the paper is in the development of formulas for calculating the drilling organization's annual income depending on drilling speed characteristics. Fast drilling technology offers clear advantages as compared to the conventional one. The practical application of the paper is in determining the optimum speed and drilling conditions that ensure cost-effective degassing. The theoretical assumptions were confirmed by the results obtained from using the fast drilling operation technology developed by "Donetsksteel".
References
Ilyashov M.A. Kozhushok O.D., Turchin V.A., Shevelev V.L., (2012). Bureniye skvazhin dlya osvoyeniya metano-ugol'nykh mestorozhdeniy
Donbassa [Drilling of Wells for Development of Methane and Coal Deposits in Donbass]. Burinnya – Drilling, 1, 89–92 (in Russian).
Turchin V.A., Khalimendikov Ye.N., Shevelev V.L., Pilipets V.I., (2013). Introduction of Fast Drilling Methods for Degassing Wells Drilling. Ugol' Ukrainy – Coal of Ukraine, 7, 20–22 (in Russian).
Ilyashov M.A. Kozhushok O.D., Turchin V.A., Shevelev V.L. Pilipets V.I. (2012). Use of Mud Motors for Degassing Wells Drilling in Donbass. Mayning Report Glyukauf – Mining+Geo/Glückauf (Russian Edition), 4, 5660 (in Russian).
Cherevatskiy D.Yu. (2006). Types of Investment Projects and Annuities that Ensure their Break-even Result. Ekonomika promyshlennosti – Industrial Economics, 2, 158–161 (in Russian).
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Visnyk of Taras Shevchenko National University of Kyiv. Geology

This work is licensed under a Creative Commons Attribution 4.0 International License.
Read the policy here: https://geology.bulletin.knu.ua/licensing